  FAQs on ESIA of CASA-1000
Wednesday, 17 May 2017 16:11 3048

       All of the necessary power generation infrastructure needed for CASA-1000 is already in place. In fact, much of the surplus electricity available to CASA-1000 being generated with water that simply would have been spilled for lack of an outlet for the power. When complete, the full CASA-1000 transmission